The Region Planner allows you to quickly update a service engineer’s working region for any specific day or week. The system automatically handles conflicts, updates region membership, and prevents overlapping assignments.
Accessing the Region Planner #
-
Step 1: Open the Service Engineer Record #
- Go to App Launcher → FieldAx → Service Engineer Record
- Open the record of the engineer whose region assignment you want to change.
-
Step 2: Scroll to Region Planner #
- At the bottom of the engineer’s record, locate the Region Planner section.
-
Step 3: Review the Default Week #
- The planner automatically displays the current week.
- You can switch to any week using the week selector.
Select the Week and Date #
-
Step 1: Choose a Week #
- Use the arrow buttons to move to the week where changes are required.
-
Step 2: Select the Day #
- Click the specific date you want to update.
- The system will check if the engineer already has a region assigned for that day.
Region Assignment Conflict Handling #
If the engineer already has a region assigned on that selected date, FieldAx displays a conflict notice:
Region Assignment Conflict – Warning
Actions Available #
- Cancel → Keep the existing region.
- Replace Assignment → Assign the new region for the selected date.
Saving Region Updates #
-
Step 1: Replace Assignment #
- If you want to proceed with the new region, click Replace Assignment on the popup.
-
Step 2: Save Changes #
- After selecting the region, click Save Changes in the Region Planner.
- The system updates the engineer’s region assignment accordingly.
#
System Splits the Regions Automatically #
Based on the selected days:
- It creates new region membership records only for the selected days.
- Remaining days will retain the original region assignment.
Example: Mid-Month Region Change
Below is an example based on a real scenario from the release workflow:
Scenario
A service engineer is originally assigned to Region A for the entire month of September.
Required Mid-Month Update
The engineer needs to work in Region B for two days in the middle of the month.
How the Region Planner Handles It
- 1st–14th → Region A
- 15th–16th → Region B (new dates selected in the planner)
- 17th–30th → Region A (Planner automatically resumes original region)
System Automation
- It creates new region membership records for the selected days.
- No manual adjustments or record editing is needed.